Footing Sizes & Site Classification (AS 2870)

How your block gets classified A to P under AS 2870, what the NCC makes you do before you pour, the NCC's 20 MPa (N20) minimum, and why the exact grade and cover come off the plan.

NCC 2025 Clause HP 4.2 Clause AS 2870

The requirement

Your block gets a letter from A to P under AS 2870 before you build (NCC 2025, Housing Provisions clause 4.2.2). The letter says how much the ground will move. Footing and slab concrete must reach at least 20 MPa (N20) (clause 4.2.10). The exact grade and cover for your job come off your engineered plan.

Why does the ground move? Clay swells when it gets wet and shrinks when it dries. That movement is what cracks slabs and footings. AS 2870 is the Australian rule book for house footings and slabs.

You have two legal paths. Classify the site, then follow the Housing Provisions Part 4.2 build rules, which mirror AS 2870. Or design the whole footing straight to AS 2870. Either way, the classification comes first. It sets everything downstream.

The site classes. A soil test on your block sets the letter. Here’s what each one means in plain words:

ClassWhat the ground does
AMostly sand or rock. Little or no movement. The calmest.
SSlightly reactive clay. A bit of movement.
MModerately reactive. More movement.
HHighly reactive clay. A lot of movement.
EExtremely reactive. Moves the most.
P“Problem” site — soft or loose soil, landslip, mine subsidence, or reactive/collapsing fill. Always needs an engineer.

You don’t pick the class yourself. A soil tester or engineer bores the block and tells you. Your job is to build to the class they give you.

123max 1:40≥ 300 mm
NCC 2025 Housing Provisions 4.2 · AS 2870
  1. 1 footing
  2. 2 reinforcement
  3. 3 ground

Prepping the trench. Once the footing is designed, clause 4.2.3 tells you how to get the ground ready:

  • Strip the topsoil. That’s the layer with grass roots in it.
  • Keep the trench clean. No loose earth, tree roots, mud or debris in the bottom when you pour.
  • Keep the base roughly level. It may fall up to 1:40 so water can drain away.
  • On loose sand, or ground that washes away easily, the footing bottom must sit at least 300 mm below the finished ground level.

The grade and the cover. Housing Provisions clause 4.2.10 sets a floor. Footing and slab concrete must reach at least 20 MPa (grade N20) at 28 days. Never pour below that. Above the floor, the grade for your site class comes from AS 2870. Reactive sites need more. The cover over the steel comes from AS 3600. It changes with how exposed the concrete is. So the exact numbers come off your engineered plan, or from your engineer. If a mate quotes a grade off the top of his head, check it against the plan before you order the truck.

Work it out by hand

The trench prep is code. The volume of concrete you order is just maths, and it feeds straight into the calculator. Say you’ve got a strip footing to pour. These are example numbers, not code minimums. Your real sizes come off the plan:

  • Total length of trench: 24 m
  • Trench width: 0.45 m
  • Footing depth: 0.5 m

Volume = length × width × depth.

24 × 0.45 × 0.5 = 5.4 m³.

So you’d order about 5.4 cubic metres. Then add a bit for spillage and an uneven trench bottom. Most blokes tack on 5 to 10 per cent. Swap in your own lengths and the calculator does the sum for you.

Do it in 5 seconds

Sources

  • NCC 2025, ABCB Housing Provisions Standard, Part 4.2 “Footings, slabs and associated elements” — site classification to AS 2870 (clause 4.2.2) and excavation rules including the 1:40 fall and the 300 mm depth on loose/erosion-prone sites (clause 4.2.3), and the minimum 20 MPa (N20) concrete strength (clause 4.2.10). Confirm at ncc.abcb.gov.au.
  • AS 2870 — Residential slabs and footings — sets the site classes (A to P) and the concrete strength grade for each class. The grade must be read from AS 2870 or your engineered plan, not assumed.
  • AS 3600 — Concrete structures — sets the concrete cover over the steel, which depends on the exposure. Check the cover in AS 3600 or on your plan.

Content adapted from the National Construction Code 2022, provided by the Australian Building Codes Board under the CC BY 4.0 licence.

Frequently asked questions

What is site classification and who does it?
It's a letter that says how much the ground under your house will move as it gets wet or dries out. NCC 2025 requires classification to AS 2870 before you build (Housing Provisions clause 4.2.2). The classes run A, S, M, H, E and P. A soil tester or engineer sets the class, not you.
What do the site classes A to P mean?
A is the calmest: mostly sand or rock, little movement. S is slightly reactive clay. M is moderately reactive. H is highly reactive. E is extremely reactive and moves the most. P is a 'problem' site: soft or loose soil, landslip, mine subsidence, or dodgy fill. It always needs an engineer.
What concrete grade do I use for my footings?
The NCC sets a floor of 20 MPa, grade N20 (Housing Provisions clause 4.2.10). Never pour below that. Above the floor, the grade depends on your site class under AS 2870. The cover over the steel comes from AS 3600 and depends on exposure. Read the real numbers off your engineered plan.
How do I prep the trench before I pour?
Housing Provisions clause 4.2.3 sets the rules. Strip the topsoil. Keep the trench clean: no loose dirt, tree roots, mud or rubbish. The base can be roughly level, with a fall up to 1:40 so water drains. On loose sand or ground that washes away, the footing must sit at least 300 mm below finished ground level.
Does clause 4.2 tell me to slope the ground away from the house or add termite protection?
No. Falling the ground away from the building, termite protection and damp-proofing are all real rules. But they live in other parts of the NCC, not in the footing clause. Don't read them into 4.2. This clause is about classifying the ground and getting the trench right before the pour.