Ordering concrete is unforgiving: order 0.3 m³ (0.4 yd³) too little and you are left scrambling to hand-mix 30 bags of premix before a cold joint forms across your slab; order too much and you pay for wasted agitator capacity and disposal.
The Chippy Tools Concrete Calculator calculates exact volumes for rectangular slabs, strip footings, circular post holes, round pads, and concrete stairs in both metric (cubic metres m³) and imperial (cubic yards yd³ and cubic feet ft³)—showing both your net theoretical volume and a +10% site wastage total offline on iOS and Android.
Quick Reference Table 1: Concrete Slab Volume & Bag Counts (Metric & Imperial)
Use this lookup table for standard 100 mm (4-inch) and 150 mm (6-inch) slabs. Bag counts include a 10% wastage buffer:
| Slab Size (Imperial / Metric) | Area | 4" / 100 mm Net Volume | 4" / 100 mm Order (+10%) | 80 lb Bags (US, +10%) | 20 kg Bags (AU/UK, +10%) | 6" / 150 mm Order (+10%) |
|---|---|---|---|---|---|---|
| 6 × 4 ft (1.8 × 1.2 m) | 24 ft² (2.2 m²) | 0.30 yd³ (0.22 m³) | 0.33 yd³ (0.24 m³) | 15 bags | 26 bags | 0.49 yd³ (0.36 m³) |
| 8 × 10 ft (2.4 × 3.0 m) | 80 ft² (7.2 m²) | 0.99 yd³ (0.72 m³) | 1.09 yd³ (0.79 m³) | 49 bags | 85 bags | 1.63 yd³ (1.19 m³) |
| 10 × 10 ft (3.0 × 3.0 m) | 100 ft² (9.0 m²) | 1.23 yd³ (0.90 m³) | 1.36 yd³ (0.99 m³) | 61 bags | 106 bags | 2.04 yd³ (1.49 m³) |
| 12 × 10 ft (3.6 × 3.0 m) | 120 ft² (10.8 m²) | 1.48 yd³ (1.08 m³) | 1.63 yd³ (1.19 m³) | 74 bags | 128 bags | 2.44 yd³ (1.78 m³) |
| 12 × 16 ft (3.6 × 4.8 m) | 192 ft² (17.3 m²) | 2.37 yd³ (1.73 m³) | 2.61 yd³ (1.90 m³) | 118 bags | 204 bags | 3.91 yd³ (2.85 m³) |
| 20 × 20 ft (6.0 × 6.0 m) | 400 ft² (36.0 m²) | 4.94 yd³ (3.60 m³) | 5.43 yd³ (3.96 m³) | 245 bags | 425 bags | 8.15 yd³ (5.94 m³) |
| 24 × 24 ft (7.2 × 7.2 m) | 576 ft² (51.8 m²) | 7.11 yd³ (5.18 m³) | 7.82 yd³ (5.70 m³) | 352 bags | 612 bags | 11.73 yd³ (8.55 m³) |
(Rule of thumb: Once your project exceeds 1.0 to 1.5 m³ (1.3 to 2.0 yd³)—around 50 to 70 bags—ordering a ready-mix agitator truck or mini-mix delivery is faster, cheaper, and structurally stronger than mixing bags on site.)
Quick Reference Table 2: Post-Hole & Pier Concrete Volume (Per Hole)
Calculated using the cylinder formula Volume = π × r² × Depth (before subtracting submerged post displacement):
| Hole Diameter | Hole Depth | Volume per Hole (ft³ / yd³) | Volume per Hole (Litres / m³) | 80 lb Bags per Hole | 20 kg Bags per Hole |
|---|---|---|---|---|---|
| 8 in (200 mm) | 24 in (600 mm) | 0.70 ft³ (0.026 yd³) | 18.8 L (0.019 m³) | 1.2 bags | 2.0 bags |
| 10 in (250 mm) | 24 in (600 mm) | 1.09 ft³ (0.040 yd³) | 29.5 L (0.030 m³) | 1.8 bags | 3.1 bags |
| 10 in (250 mm) | 36 in (900 mm) | 1.64 ft³ (0.061 yd³) | 44.2 L (0.044 m³) | 2.8 bags | 4.7 bags |
| 12 in (300 mm) | 36 in (900 mm) | 2.36 ft³ (0.087 yd³) | 63.6 L (0.064 m³) | 4.0 bags | 6.8 bags |
| 12 in (300 mm) | 42 in (1,050 mm) | 2.75 ft³ (0.102 yd³) | 74.2 L (0.074 m³) | 4.6 bags | 8.0 bags |
| 12 in (300 mm) | 48 in (1,200 mm) | 3.14 ft³ (0.116 yd³) | 84.8 L (0.085 m³) | 5.3 bags | 9.1 bags |
| 18 in (450 mm) | 48 in (1,200 mm) | 7.07 ft³ (0.262 yd³) | 190.9 L (0.191 m³) | 11.8 bags | 20.5 bags |
(Checking how deep your deck piers or footing trenches need to go for frost protection or reactive clay? See our 14-country Footing Depth & Frost Line Rules guide.)
Three Concrete Calculator Modes in Chippy Tools
1. Rectangular Slabs, Patios & Strip Footings
Open Concrete Quantities → Slab and enter Length, Width, and Depth:
Metric Formula:
Cubic Metres (m³) = Length (m) × Width (m) × (Depth (mm) ÷ 1,000)Imperial Formula:
Cubic Yards (yd³) = [Length (ft) × Width (ft) × (Depth (in) ÷ 12)] ÷ 27
- Metric worked example (6 m × 4 m shed slab at 100 mm thick):
- Net volume =
6 × 4 × 0.10= 2.40 m³ - With +10% wastage = 2.64 m³
- Net volume =
- Imperial worked example (12 ft × 10 ft patio at 4 in thick):
- Net volume =
12 × 10 × (4 ÷ 12) = 40.0 ft³ ÷ 27= 1.48 yd³ - With +10% wastage =
44.0 ft³= 1.63 yd³ (or 74 bags of 80 lb premix)
- Net volume =
2. Post Holes, Sonotubes & Circular Piers
Select Holes and enter the Hole Depth, Hole Diameter (Width), and Number of Holes:
Cylinder Formula:
Total Volume = Number of Holes × π × (Diameter ÷ 2)² × Depth
- Worked example (8 fence post holes, 300 mm wide × 750 mm deep):
- Radius =
150 mm = 0.15 m - Single hole volume =
3.1416 × 0.15² × 0.75= 0.053 m³ (53 litres) - 8 holes =
0.053 × 8= 0.424 m³ net (0.47 m³ with +10% buffer, or ~50 bags of 20 kg rapid-set concrete). - Tip: If a 100 × 100 mm timber post sits 750 mm deep inside each hole, subtract
8 × (0.10 × 0.10 × 0.75) = 0.06 m³(6 bags) for the timber displacement.
- Radius =
3. Circular Slabs & Round Tank Pads
Select Circular Slabs and enter the Diameter (Width) and Slab Thickness (Depth) to calculate concrete for round rainwater tank pads, fire-pit aprons, and circular gazebos.
Related Concrete Guides & Calculators
- Free Browser Concrete Volume Calculator: Run quick slab and cylinder calculations directly in your browser.
- How to Calculate Yards of Concrete (Formula + Slab Chart): Detailed US imperial yardage guide for 4" and 6" slabs.
- How to Estimate Concrete Bags: Complete Calculator Guide: Yield breakdown for 20 kg, 25 kg, 40 kg, 40 lb, 60 lb, and 80 lb premix bags.
- How Much Concrete Do I Need for a Shed Base?: Sub-base preparation, formwork, reinforcement, and shed slab sizing.
- How Long Does It Take for Concrete to Dry & Cure?: Walk-on, vehicle loading, and 28-day curing milestones.
- Concrete vs. Cement: Nominal mix ratios (
1:2:4vs1:2:3) and ingredient roles. - Gravel Calculator & Check Square Calculator: Estimate compacted sub-base aggregate and square your formwork diagonals before the truck arrives.