Framing a standard flat stud wall is routine—cut every common stud to the same length, mark 450 mm or 600 mm (16" or 24") centres on the top and bottom plates together, and nail it up. A raked wall (gable end wall, skillion wall, or vaulted-ceiling partition) throws out that workflow. Because the top plate follows the roof pitch, every stud is a different length, every stud top needs a mitre/plumb cut at the pitch angle, the vertical deduction for the tilted top plate changes with the angle, and the layout marks along the raked top plate are wider apart than the marks on the bottom plate.
Get one plate deduction or bevel direction wrong and every stud down the wall misses its mark. The Chippy Tools Raked Wall Calculator takes your wall dimensions—either from two heights or from low height + pitch—and produces the exact cut list, bevel angle, bottom-plate layout, and raked top-plate layout offline on iOS and Android.
Quick Reference: Raked Wall Geometry & Formulas
Every raked wall forms a right-angled triangle sitting on top of a knee wall (the low-end height). Here are the core formulas the calculator runs behind the scenes:
| Measurement | Formula (using Pitch Angle θ) | Formula (using Low Height H₁, High Height H₂, Length L) |
|---|---|---|
| Total Rise (ΔY) | Length × tan(θ) | H₂ − H₁ |
| Pitch Angle (θ) | Known input (or arctan(Rise ÷ 12)) | arctan((H₂ − H₁) ÷ L) |
| Raked Top Plate Length | L ÷ cos(θ) | √(L² + (H₂ − H₁)²) |
| Top Plate Vertical Depth | Top Plate Thickness ÷ cos(θ) | Top Plate Thickness × (Top Plate Length ÷ L) |
| Long-Point Diff Across Stud | Stud Width × tan(θ) | Stud Width × ((H₂ − H₁) ÷ L) |
| Height Gain per Stud Spacing | Spacing × tan(θ) | Spacing × ((H₂ − H₁) ÷ L) |
| Spacing Along Top Plate | Horizontal Spacing ÷ cos(θ) | Horizontal Spacing × (Top Plate Length ÷ L) |
Two Ways to Calculate a Raked Wall
On site, your plans or existing framing will give you one of two starting points. Chippy Tools supports both:
1. The Two-Heights Method (Low Height + High Height)
Use this when framing an infill wall under an existing rafter or truss line, building under stairs, or working off architectural elevations that state the low wall height (H₁), high apex height (H₂), and total bottom-plate run (L).
- Inputs: Bottom plate length, low side height, high side height, stud spacing, plate thicknesses, and stud thickness.
- Outputs: The exact rake angle in degrees, raked top-plate length, and every stud’s length and position.
2. The Pitch Method (Low Height + Roof Pitch)
Use this when framing a new skillion or gable wall where you know the low-side wall height, the horizontal wall length, and the roof pitch (e.g., 22.5°, 26.57°, or 6/12).
- Inputs: Bottom plate length, low side height, pitch angle, stud spacing, plate thicknesses, and stud thickness.
- Outputs: High-end wall height, raked top-plate length, and the full stud schedule.
Worked Examples (Metric & Imperial)
Metric Example: 3.6 m Skillion Wall at 450 mm Centres
Suppose you are framing a 3,600 mm long raked wall that rises from 2,400 mm at the low end to 3,300 mm at the high end, using 90 × 45 mm timber (45 mm thick plates and 45 mm thick studs on edge) at 450 mm centres:
- Total rise: 3,300 − 2,400 = 900 mm
- Rake angle (θ):
arctan(900 ÷ 3,600) = arctan(0.25)= 14.04° (set your mitre/drop saw bevel to 14.0°) - Raked top plate length:
√(3,600² + 900²)= 3,710.8 mm - Plate height deductions:
- Bottom plate vertical thickness = 45.0 mm
- Tilted top plate vertical depth =
45 ÷ cos(14.04°) = 45 ÷ 0.9701= 46.4 mm - Across a 45 mm stud face, the bevel drops by
45 × tan(14.04°)= 11.25 mm from long point to short point.
- Height gain per 450 mm stud bay:
450 × tan(14.04°) = 450 × 0.25= 112.5 mm per bay. - Top plate layout spacing:
450 ÷ cos(14.04°)= 463.8 mm centres along the slope (so the studs stand plumb when the top plate is pitched).
| Stud # | Bottom Plate Mark | Top Plate Slope Mark | Overall Wall Height | Stud Long-Point Cut |
|---|---|---|---|---|
| Stud 1 (Low End) | 0 mm | 0 mm | 2,400 mm | 2,319.9 mm |
| Stud 2 | 450 mm | 464 mm | 2,512.5 mm | 2,421.1 mm |
| Stud 3 | 900 mm | 928 mm | 2,625.0 mm | 2,533.6 mm |
| Stud 4 | 1,350 mm | 1,392 mm | 2,737.5 mm | 2,646.1 mm |
| Stud 5 | 1,800 mm | 1,855 mm | 2,850.0 mm | 2,758.6 mm |
| Stud 6 | 2,250 mm | 2,319 mm | 2,962.5 mm | 2,871.1 mm |
| Stud 7 | 2,700 mm | 2,783 mm | 3,075.0 mm | 2,983.6 mm |
| Stud 8 | 3,150 mm | 3,247 mm | 3,187.5 mm | 3,096.1 mm |
| Stud 9 (High End) | 3,555 mm | 3,664 mm | 3,300.0 mm | 3,208.6 mm |
Imperial Example: 12 ft Gable Wall with a 6/12 Pitch at 16" OC
Suppose you are framing a 12 ft (144 in) raked wall starting at 8 ft (96 in) on the low side with a 6/12 roof pitch (26.57°), using standard 2×4 framing (1-1/2 in thick plates and studs) at 16" on-centre (OC):
- Rise per 16" stud spacing: At a 6/12 pitch, the roof rises 0.5 in per inch of run. Over 16 in, each stud grows by
16 × 0.5= 8 inches. - High-end height (H₂):
96 in + (144 in × 0.5) = 96 + 72= 168 in (14 ft). - Raked top plate length:
144 in ÷ cos(26.57°) = 144 × 1.118= 161 in (13 ft 5 in). - Top plate layout spacing:
16 in ÷ cos(26.57°)= 17.89 in (≈ 17-7/8 in OC along the raked top plate). - Plate deductions: Bottom plate = 1.5 in; tilted single top plate vertical depth =
1.5 ÷ cos(26.57°)= 1.68 in (1-11/16 in).
Three On-Site Traps to Avoid When Framing Rake Walls
- Marking the top and bottom plates side-by-side: If you lay the top plate against the bottom plate and mark 450 mm (or 16") centres across both, your studs will lean backward once the top plate is tilted up. Always use the raked top-plate running measurements (
Spacing ÷ cos(θ)) on the sloped plate so every stud stands plumb. - Measuring to the short point instead of the long point (or vice versa): Across the 45 mm (1-1/2 in) thickness of a stud, a 30° bevel creates a 26 mm (7/8 in) height difference between the short point and the long point. Hook your tape on the side of the stud that matches your layout mark (or let Chippy Tools give you the exact cut length).
- Forgetting double top plates: If your framing spec calls for a double raked top plate (2 × 45 mm = 90 mm or 2 × 1.5 in = 3 in), enter the combined thickness (90 mm or 3 in) into the top-plate thickness field so the calculator deducts the full vertical depth of both plates.
Hands-Free Spoken Measurements at the Drop Saw
Instead of walking back to your phone with sawdust on your hands after every cut, tap the speaker icon in the Chippy Tools Raked Wall Calculator. The app reads the stud-by-stud cut lengths or the running plate measurements aloud at a steady pace so you can mark the entire bottom plate, mark the raked top plate, and batch-cut every stud at the mitre saw without touching the screen.
Related Calculators
- Roof Pitch Calculator: Convert roof pitch between degrees, percentage, and
X:12ratios, and calculate rafter lengths. - Running Measurements Calculator: Mark out continuous stud, joist, or batten centres along any straight plate.
- Triangle Calculator: Solve any right-angled or oblique triangle for gable framing, bracing, and truss geometry.
- Equal Spacing Calculator: Space exposed rafters, battens, or feature wall slats evenly between fixed endpoints.